• TSX-V: FMC | OTCQB:FDCFF

Costigan


Ownership: Forum 100%
Stage: Highly Prospective; Drill Ready
Size: 730 ha
Location &
Infrastructure
Regional infrastructure to the properties is good with nearby year-round road access (Highway 914 to Key Lake is 5km away), readily available power nearby, and close proximity to Cameco’s Key Lake uranium processing facility.
Regional
Significance
This project covers the southwestern extension of the graphitic conductive unit that hosts the Key Lake deposits.
Proximity to
significant
deposits
Cameco’s former producing Key Lake mine, which extracted over 200 million pounds of uranium by open pit methods at an average grade of 2.3% U3O8 from 1983 to 1997, is located nearby to the north of the Costigan property.

Outlook

  • Exploration focus is on discovering basement-hosted type uranium deposits similar to Millennium, Eagle Point, Sue C, Triple R, Roughrider, and Arrow, which can extend down to 900m below the unconformity.

Work Programs for 2021

  • Under Review. Available for partnering.

Historical Work

  • The project is drill ready having EM and gravity surveys completed over the entire property. The project is in good standing until 2029.

Costigan Location Map

 


©2024Forum Energy Metals Corp.
All rights reserved.